To Check the Current Sync Status

This procedure details the steps in SmartInspect for checking the current sync status of the building index, inspection request database, and inspection reports database.
Note: Ensure that SmartInspect is open, and is the selected view. If necessary, see To Switch to SmartInspect from SmartCapture.
  1. If you already have an inspection open in the foreground within SmartInspect, tap Map to return to the application map.
  2. At the map, view the sync status icon in the top left to determine current sync status
    Note: The sync status will be Green for a completed sync, Red for a failed sync, and will display a spinner if the sync is in progress.
The current sync status of the building index, inspection request database, and inspection reports database has been successfully checked.